CEMENT PLANTS

KEY HIGHLIGHTS

  • Established Production started February 2001
  • Production Units: 2 production Units. 3rd unit under production
  • Annual Capacity: 3.5 million MT, soon to be 7 million MT.
  • Certification: ISO 9001:2008 & ISO 14001:2004
Loading...
Cement Plant

Quality Control

Seven Rings Cement. prides itself in providing quality cement to customers. With two laboratories and advanced testing procedures, the brand maintains consistent quality and performance standards.

Seven Circle Bangladesh Ltd. has two methods of controlling quality – the first method is for cement testing; the second is for concrete testing. Both testing labs are equipped with all essential and up-to-date equipment.  Cement tests are executed on an hourly basis over the course of a 24-hour day. Test samples are  collected during production and from the pre-packing stage.

Third-party tests are also conducted to confirm cement performance and to provide customers with another layer of quality assurance. Tests from Bangladesh University of Engineering and Technology (BUET) are conducted once every 30 days. All equipment and instruments of the laboratory are calibrated by BUET and follow the BSTI regulations.

Distribution

Plant Information

Plant 1

Our 1st plant, Seven Circle Bangladesh Limited, was set up in Kaligonj, Gazipur district, on the Shitalakha river bank.

With a capacity of 5,350 Metric Tons per day, and a raw material storage capacity of 70,000 Metric Tons, it is a fully automated plant.

The production process includes slag dryer technology, pneumatic fly ash unloading system, and cement silos storing 10,000 metric tons of various finished products.

Plant 2

Our 2nd plant, Shun Shing Cement Mills Ltd, was set up in the Labanchara industrial area in Khulna District, on the Rupsha river bank. TWith a capacity of 4,320 Metric Tons per day, and a raw material storage of 30,000 Metric Tons, it is a fully automated pant with a ball mill roller press.

The production process includes a pneumatic fly ash unloading system, and cement silos storing 13,000 Metric Tons of various finished products

  • shun shing group

Plant 3

Shun Shing Cement Industries Ltd is currently under construction in Shikolbaha, Chattogram District, on the banks of the Shikolbaha Canal. This new plant uses the latest vertical roller mills (VRM) technology to produce cement and is slated to be in production by 2020. It is a closed-circuit, fully-automated production line, with the installed capacity of 4,320 metric tons per day.

Automation Highlights

Programmable Logic Controller (PLC) and Supervisory Control and Data Acquisition (SCADA):

  • PLC for Unit #1: SIEMENS S7-400
  • PLC for Unit #2: MODICON Telemechanique

Shun  Shing Group in Bangladesh